TUS Humanitarian Appeal · Emergency Response

Rapid Emergency Response Report

Flash Flood in Dighinala, Khagrachari Hill District

Appeal date: 22 August 2026 Incident onset: Night of 21–22 August 2026 Proposed period: 30 days
View funding request

Emergency Overview

A sudden flash flood struck Dighinala Upazila during the night of 21–22 August 2026 following exceptionally intense rainfall. The Dighinala weather observation station recorded approximately 103 millimetres of rainfall within only three hours. The resulting rapid rise of the Maini River and surrounding mountain streams inundated low-lying settlements before many families could protect food, belongings and essential household items.

Initial reports confirm flooding in Merung, Kabakhali and Boalkhali unions. Homes, sections of the Dighinala–Merung road and Aman paddy fields have been submerged. Landslides at the 5 Mile and 9 Mile areas also disrupted access along the Khagrachari–Dighinala–Sajek road.

103 mmRainfall recorded in approximately three hours
3 unionsConfirmed priority unions in Dighinala
500 HHMaximum initial planning target—not a confirmed affected count
30 daysProposed immediate response period
Data caution: The local administration is preparing the affected-household list. No verified total for affected houses, population, crop acreage or financial loss was available at the reporting cut-off. TUS will use verified assessment data before final beneficiary selection or distribution.

Confirmed Affected Areas and Immediate Concerns

AreaReported impact
Merung UnionLow-lying villages, homes, agricultural land and sections of the Dighinala–Merung road inundated.
Kabakhali UnionLow-lying settlements and agricultural land affected by rising river and hill runoff.
Boalkhali UnionHomes and Aman fields affected; rapid rise of Boalkhali Chhara flooded JamTali.
Chowmuhani–JagannathparaWater entered homes, including houses reportedly unaffected during the previous flood.
5 Mile and 9 MileLandslides disrupted movement along the Khagrachari–Dighinala–Sajek road.

Immediate humanitarian concerns

  • Loss of stored food and essential household belongings
  • Unsafe drinking water and contaminated sanitation facilities
  • Temporary displacement and exposure to further rainfall
  • Waterborne disease and hygiene risks

Protection and livelihood concerns

  • Risks to children, older people, pregnant women and persons with disabilities
  • Aman crop damage and possible livelihood loss
  • Restricted market, health and relief access
  • Further flooding or landslides if rainfall continues

Proposed Emergency Response

1. Rapid assessment and verification

Deploy trained TUS staff and volunteers to record household impact, vulnerability, GPS location, priority needs and evidence, and coordinate results with the Upazila Administration and Union Parishads.

2. Emergency food assistance

Provide needs-based emergency food or ready-to-eat packages to highly vulnerable households, subject to market availability and verified gaps.

3. WASH and essential household support

Provide safe water, purification tablets, hygiene materials, menstrual-hygiene items and context-appropriate shelter and essential household materials.

4. Protection and referral

Prioritise severely affected and at-risk households and refer urgent health, protection, disability or specialised needs to appropriate services.

Selection principle: The proposed target of up to 500 households is an operational planning ceiling only. Final coverage will be determined through severity-based household verification, local coordination and duplication checks.

TUS Capacity and Accountability

Why TUS

TUS is a Khagrachari-based local organisation with community networks, knowledge of the local geography and languages, and operational experience across the Chittagong Hill Tracts. Its staff and volunteers can support rapid access, verification, coordination and monitoring.

Minimum commitments

  • Transparent vulnerability-based selection
  • Coordination and duplication prevention
  • Safe, dignified and inclusive distributions
  • Community feedback and complaints mechanism
  • Distribution evidence, financial records and donor reporting

Request to humanitarian partners

TUS requests flexible emergency funding, relief materials or logistical assistance. Early support is critical to prevent deterioration in food security, safe-water access, health and household protection.

Contact TUS

Photographic Evidence

Field-photo reference: The following 18 photographs were supplied for inclusion in this TUS emergency appeal. Photos 1–15 document flood impacts reported from Dighinala, while Photos 16–18 were identified by the contributor as Khagrachari Sadar locations near the Chengi River. Together they visually document inundated agricultural land, household compounds, community access routes, public facilities, emergency boat movement, high river water and one visibly damaged residential structure. Exact GPS locations, capture times, photographer names and household identities were not embedded in the supplied files and should be confirmed through TUS field records before they are cited as household-level verification.
Agricultural inundation
Photo 1: Agricultural inundationStanding crops surrounded by floodwater, documenting direct exposure of cultivated land.
Flooded homestead vegetation
Photo 2: Flooded homestead vegetationFloodwater covering a residential yard and surrounding trees and bamboo.
Cultivated land beside homes
Photo 3: Cultivated land beside homesA large waterlogged plot adjoining residential structures.
Inundated residential passage
Photo 4: Inundated residential passageFloodwater restricting movement through a narrow passage between houses.
Homestead and garden flooding
Photo 5: Homestead and garden floodingWater surrounding household garden structures and access space.
Visibly damaged house
Photo 6: Visibly damaged houseCollapsed corrugated-metal wall or roofing sheets beside a flooded household structure.
Flooded access between houses
Photo 7: Flooded access between housesStanding water affecting a narrow residential route beside a bamboo-walled house.
Banana cultivation submerged
Photo 8: Banana cultivation submergedFloodwater covering a banana plot and threatening household agricultural production.
High river and floodplain water
Photo 9: High river and floodplain waterExtensive water level across the river or adjoining floodplain.
Flooded household compound
Photo 10: Flooded household compoundWater surrounding homes, fences and household access areas.
Submerged footbridge or walkway
Photo 11: Submerged footbridge or walkwayFloodwater covering the walking surface and restricting safe community movement.
Waterlogged residential lane
Photo 12: Waterlogged residential laneDeep standing water between closely spaced homes and boundary structures.
Flooded community pathway
Photo 13: Flooded community pathwayStanding water covering a local pathway bordered by household fencing.
River overflow near housing
Photo 14: River overflow near housingHigh water extending toward a riverside house and access path.
Elevated river level near bridge
Photo 15: Elevated river level near bridgeWide floodwater extent visible beside a bridge and raised riverside structure.
Flooded institutional compound near the Chengi River
Photo 16: Flooded institutional compoundStanding floodwater across an institutional compound in Khagrachari Sadar near the Chengi River.
Boat movement through flooded settlement near the Chengi River
Photo 17: Boat movement through flooded settlementResidents travelling by boat through an inundated neighbourhood in Khagrachari Sadar near the Chengi River.
Flooded household and livelihood assets in Ganjpara
Photo 18: Flooded household and livelihood assetsFloodwater affecting a household compound and stored livelihood materials in Ganjpara, Khagrachari Sadar, near the Chengi River.

Video and Social-Media Evidence

Click any photograph to open the full-resolution evidence file. Photographs should be used with appropriate consent and protection safeguards; they demonstrate visible conditions but do not independently establish total household or monetary losses.

Evidence Sources and Reporting Note

Reporting status: This is a rapid emergency appeal based on public reporting available on 22 August 2026. It is not a final damage-and-needs assessment. Figures and priorities must be refreshed using government information and TUS field verification before implementation.